Episode 92: Behind Schedule and Ahead of the Heavy Metal Curve
Another Metal Podcast10/06/18 • 121 min
Yeah, I'm late with another episode, but the music is still brand-new. Life can get busy, however that doesn't stop the promo inbox from filling up with upcoming and newly-released slabs of new heavy metal, so here's a healthy serving of some choice picks from the past couple of months.
10/06/18 • 121 min
Episode Comments
0.0
out of 5
No ratings yet
eg., What part of this podcast did you like? Ask a question to the host or other listeners...
Post
Generate a badge
Get a badge for your website that links back to this episode
Select type & size
<a href="https://goodpods.com/podcasts/another-metal-podcast-100791/episode-92-behind-schedule-and-ahead-of-the-heavy-metal-curve-5314306"> <img src="https://storage.googleapis.com/goodpods-images-bucket/badges/generic-badge-1.svg" alt="listen to episode 92: behind schedule and ahead of the heavy metal curve on goodpods" style="width: 225px" /> </a>
Copy